Making Green Technologies Affordable & Profitable
“Another BIG Palm oil Group PT.Sarimas, Indonesia Selects Green Technology of KIS Group for POME TREATMENT WITH “ZERO PONDS” The contract was signed in November 2011”.
CDM
 
  MANY “FIRST” TO OUR CREDIT:  
     
  WOWW ! PROJECT ( Wealth Out Of Waste Water ):
 
     
  Conceived and Designed TOTAL GREEN TECHNOLOGY project with ZERO Ponds & Higher BIOGAS for Palm oil Mill effluent(POME). This technology eliminates the need to have conventional PONDS (lagoons) required for POME treatment, there by eliminating all ENVIRONMENTAL HAZARDS OF OPEN PONDS. 2 PROJECTS ARE IN OPERATION AND ANOTHER 12 PROJECTS ARE UNDER CONSTRUCTION. All projects in South East Asia under CDM consideration.  
     
  Advantages of Zero Ponds & Biogas:  
     
  Eliminates environmental hazards of ponds like  
       
  Underground water pollution  
  Methane emission  
  Waste of Fertile land & pond are life long liability.  
     
  Commercial benefits of Zero Ponds & Biogas Projects:  
     
  Some few hectares of fertile land ( can be available for planting ).  
  Revenue from carbon credit.  
  Revenue from use of biogas.  
  Life long commercial benefits ( no desludging cost ).    
     
  Other Industries:  
     
  Our technologies are proven for all other types of industries like Distilleries, Chemical, Food Processing, Pig Farms, Chicken litter.  
     
     
  CDM SUCCESS STORIES :
 
     
  ALL FIRST 6 PROJECTS CDM REGISTERED  
     
  SUCCESSFULLY REGISTERED, MALAYSIA'S FIRST PROJECT IN RUBBER GLOVE INDUSTRY, UNDER TECHNOLOGICAL BARRIERS.  
     
  TITI GLOVE BIOMASS FUEL SWITCH, in Muar, Johor State, Malaysia.
 CDM Registration reference no.: 2611
 
     
  Milestones :  
     
  Validation audit successfully completed on 27th May 2009,  
  Project CDM registered on 13th August 2009 with reference number 2611  
  Project successfully commissioned/operating from 5th June 2008.  
  Link to UNFCC website to get all relevant details: https://cdm.unfccc.int/Projects/registered.html  
     
  PHOTOS OF STAKE HOLDERS MEETING AND VALIDATION AUDIT FOR TITI GLOVE PROJECT  
     
 
 
       
   
       
 
     
  G. B. INDUSTRIES SDN. BHD. (Special Electrical Glove Industry in Malaysia)  
     
  CDM Registration reference no.: 4311  
     
  Milestones :  
     
  Validation Audit successfully Completed on 9th Sept. 2009  
  Project successfully commissioned/operating from March 2009 in Matang Manufacturing Sdn Bhd.  
  Project CDM registered on 14th April 2011 with Ref. no. 4310  
     
  FILMAX SDN. BHD. (Rubber Thread Industry in Malaysia)  
     
  CDM Registration reference no.: 3004  
     
  Milestones :  
     
  Validation Audit successfully Completed on 24th Feb. 2010  
  Project successfully commissioned/operating from December 2010  
  Project CDM registered on 15th June 2010 with Ref. no. 3004  
     
     
    Stake Holders Meet in Progress at Filmax.  
     
  RENEWABLE ENERGY HEATING SOLUTIONS :
 
     
  This project carries the Identification of Many first!!.  
     
  First project in Malaysia /South east asia to Get CDM registration for such  Technology.  
  First to Introduce to High efficiency, Fludised Bed combustion technology to Malaysia.  
  First CDM project in Malaysia to qualify under Technological barrier for Rubber Glove Industry.  
     
  With this project KIS stared its journey of Pioneering Renewable energy solutions for Rubber glove industry. KIS is un-disputed leader in CDM projects for Rubber Glove Industry in Malaysia.  
     
  The technology was designed specifically for TITIGLOVE BIOMASS FUEL SWITCH PROJECT at Muar, Johor, Malaysia: the FIRST PROJECT IN MALAYSIA / SOUTH EAST ASIA USING LATEST  “FBC” ( FLUIDISED BED COMBUSTION ) with 5 PASS DESIGN and HIGHEST EFFICIENCY BIOMASS THERMAL OIL HEATER. This utilizes biomass( paddy husk, palm kernel shell, saw dust and other agro wastes ) as a fuel to generate energy . Biomass is replacing the presently consumed fuel oil to generate energy, thus saving cost of fuel oil and reducing dependence on Fossil fuel.  
     
  SUCCESS STORY IN PICTURES…….from start to Commissioning to operation  
     
 
     
     
 
 