Major Feasibility/Consultancy Projects By KIS Group
Sr No Description Client/Location
1 Feasibility study of Organic waste to Energy/Power Plant for export of power grid & captive use , PPT Energy trading Co., Japan PPT Energy Trading Co., Japan
2 Consultancy & feasibility study to achieve Zero Carbon foot Prints at Unilever factory in Indonesia by using BioCNG to replace Natural GAS. BioCNG volume 200,000 M3/day . Unilever, Indonesia
3 Feasibility study of Biogas & BioCNG from Waste Water Treatment & Carbon credits, for KRICC, Korea Korean Research Institute on Climate Change, Korea
4 Feasibility study of Municipality /Organic waste to BioCNG piping to houses, Nepal Next Era, Damak, Nepal
5 Feasibility study of Organic waste to BioCNG for 3 Sugar mills combined, Nagpur, India for MANAS group. Feedstock used: Pressmud, Napier Grass, food waste, vegetable waste, rice straw & sugar cane tops. Manas Group, Nagpur, India
6 Feasibility study of Organic waste to BioCNG piping for houses of 2 Villages, Sarawak, Malaysia Craun Research, Sarawak, Malaysia
7 Consultancy & Feasibility study for waste to Biogas used for Canteen Kitchen, Torrent Pharma, Gujarat Torrent Pharmaceuticals, Gujarat, India
8 Feasibility study for Current Combined Effluent Treatment Plant and for further expansion of the plant- Design, BOQ and for tendering process Reckitt Benckiser, Mysore, India

1. ZERO CARBON FOOTPRINT CONSULTANCY

We offer expert consultancy services starting from collecting the facts and assessing the present carbon foot print and then conceptualising, planning and implementation of the projects to achieve zero carbon foot print in short term/long term. We have provided consultancy to various industries in several countries. We assess carbon footprints, indentify ways to reduce emissions, and set emissions reduction goals.

UNIOLEO (Unilever INDONESIA) were currently using Natural gas for their different forms of energy requirement in their manufacturing process. KIS GROUP has proposed BioCNG® generated from POME to replace the use of natural gas for all their energy requirements to make their operation pollution free and achieve ZERO CARBON FOOT Print. The technology/plan being adopted for continuous supply of the fuel is through short and long term goals by treating the POME waste using ZPHB® and upgrading biogas to BioCNG® which can be transported to the unileo location through cascades thus replacing their natural gas consumption.

We assure the clients for reduced costs of the energy, comply with the legislation and enhance the brand value.

2. FEASIBILITY REPORTS FOR PROJECTS

We have skilled and expert team for preparation of feasibility reports for Biogas power plants, BioCNG® plants and upgrading of existing plants. Our consultancy services includes feasibility study for the project consisting of

1. Assistance in choosing the right location for the project

2. Choosing the right technology

3. Complete financial anslysis of IRR & Equity IRR

4. Planning, Designing and Costing

5. Operation & Maintenance guidelines

6. Assistance in BioCNG®/ BioPOWER® Sales

3. IMPROVE/REVAMPING/UPGRADING EXISTING BIOGAS PLANTS, ETP & STP

Re-engineering / retrofitting & revamping of existing sewage treatment plant, effluent treatment plant & anaerobic system are done to meet the client requirements / local discharge norms. Revamping / Retrofit is required due to increased flow capacity of the plant, organic load, process change, new environmental legislation, to reduce OPEX cost by having advanced technology, process improvements, corporate sustainability, additional nutrients removal from the system and failure of existing system. The revamping/modifications work is done using the existing civil and mechanical units already present on the site

consultancy1
consultancy2

4. ANNUAL TECHNICAL, MAINTENANCE & OPERATION SUPPORT

We are committed to providing our customers with top-quality service on a day-to-day basis. We provide our customers the services benefits and operational managements. We closely monitor the plant performance data on day to day basis and also undertake comprehensive and non-comprehensive, Operational Contract to operate & maintain the plant on a long term basis. We guarantee excellence through our technological experience and concerted efforts. This helps our customers to adhere to the local legislation prescribed by each country for the discharge norms of the efficient from the international and domestic usage. The services are continuous in nature with our extensive known and recognized competence. KIS GROUP continues to sharpen its skills to optimize the efficiency of the plants resulting into growing benefits to the customer.

The O&M team comprises of well experienced Managers, Engineers & Technicians who carry out services and are available for 24x7 basis, 365 days. We do the preventive maintenance every 3 months based on customer requirements and provide overhauling guidance. The anaerobic reactor is tested for optimum pH and all the pumps, equipment’s and process are checked thoroughly for smooth running of the entire process.

Whenever there is a breakdown then our local staff in each country provides support for spare parts, efficiency trials and solves performance related issues along with the uphand running of the plants within a short period of time. In case of Biogas power plants skilled service engineer are available round the clock so that the power generation is continuous thus maximizing the profits for the customers through the sale of power through grid.

Thus the services support is provided for Biogas Plants, Biogas Power Plants, BioCNG®, Water Treatment Plants for Drinking and Industrial Effluent Treatment Plants and Sewage Treatment Plants.

SCOPE OF WORK

1. Manpower for total management of treatment process on 24hrs/ 365 days ina year on site and with on call services as well.

2. Monitoring / Reviewing daily , weekly & Monthly reports.

3. Analytical analysis of process parameters based on requirements.

4. Preventive maintenance of all electro-mechanical equipment’s on day-to-day basis with all spares & consumables.

5. In case of ATS : Providing only Technical Services for monitoring / reviewing and visits for few days onsite on monthly basis to ensure smooth operation of the plants.